Error
  • The template for this display is not available. Please contact a Site administrator.

Project Highlights

  • 3
  • DSC_0036
  • DSC_0039
  • DSC_0049
  • DSC_0051
  • DSC_0053
  • DSC_0055
  • DSC_0060
  • DSC_0063
  • beams
  • before and after
  • exterior wall
  • finished
  • interior
  • parallam
  • side angle
  • siding
  • stairs
  • twins
John and Connie asked Superior Renovations to come up with a design to improve the functionality and space of the only full bathroom in their house which had loose tiles, a mold infested ceiling, cracks in the grout and no storage space. We extended the bathroom into the hallway, added a larger vanity, changed the layout of the tub and toilet and upgraded all fixtures to include a heated floor. The custom mirror should be in tomorrow and is the last piece needed to complete their new bathroom.